Deck estimate calculator
Change any option below — price updates live. Labor and materials stay separate. When the total hits what you want to spend, lock it in and request an on-site review.
Rough planning estimate only — not a final contract until we verify on site and you sign. Design choices (platforms, angles) show plain % on framing labor so you can trade shape for upgraded materials.
1. Build your deck
Every change updates the total on the right (or below on mobile).
2. Materials (optional)
Pick decking and railing to include materials in the live total. Skip for a labor-only planning number (board install is finalized when decking is chosen on site).
Choose a sample
Click a color block. Swatches are approximate — we confirm samples on site.
Selected:
Pressure-treated lumber
Standard treated decking look (demo swatch).
Railing samples
Posts + rail in the rate. Use total LF including stairs. “No railing materials” = labor only or you supply materials.
Selected railing:
3. Lock in & request on-site review
Happy with the number? Send it over — we’ll verify scope on site and have you sign the estimate.
Scope of work summary
Full line-item dollars are in the live total. Site visit confirms layout, soil, and attachment details.